https://cdnimg.rg.ru/img/content/192/44/77/Genplan_CKP_SKIF_(Proekt-AO_CPTI)_2_d_850.jpg

– Actually completed the field work on complex engineering surveys, performed geophysical survey at the site – said the CEO of the company-designer of JSC “tisc” Michael Tarasov. – When conducting surveys, we have drilled about seven thousand meters, a large number of wells up to a depth of fifty meters. Soil samples sent to the laboratory. I think by the end of July we will finish the report on integrated engineering surveys. Preliminary evidence that the site is suitable to accommodate a complex object has already been obtained.

Parallel to the design engineers together with specialists from the Institute of nuclear physics and Boreskov Institute of catalysis SB RAS has developed the project of the future complex. Was created by three architectural options that differ fundamentally from each other. One of them is selected as the primary. Prepared master plan of the location of all main and auxiliary facilities, the layout of buildings.

According to the draft, the SKIF will include 28 buildings and structures, and the total construction area will amount to nearly 77 thousand square meters. The center of a massive complex and the main building will be a circular building around the accelerator. Its external diameter will be 238 meters, and the inner ring 118. The height of this ring-shaped structure of sixteen meters. The halls of the accelerator and experiments will be the Central part of the building, in addition, it will include laboratories, utility production and engineering support.

the Second most important object will be a six-storey administrative building and adjoining three-storey block, which will house a conference hall and a medical center. Nearby is located a two-story dining room. Designers promise to apply the most modern technologies of construction and engineering solutions, and this applies to driveways, and will not interfere with existing roads and will not hinder movement.

As emphasized by the Director of the Institute of catalysis SB RAS Valery Bukhtiyarov, the design experts are actively cooperating with the administration of workers ‘ settlement Koltsovo and the government of the Novosibirsk region in the development of transport infrastructure. Also discusses the future development of adjacent parcels that are yet to Baryshevskogo the village Council.

But our work is not confined only to the object of construction, – said Valery Bukhtiyarov. – We understand that because of the opportunities offered by the CSC “SKIF”, we obviously will not get staff with higher qualification, who will be able to operate the equipment, carry on it cutting-edge research. We have another three or four years to prepare a class of new, young and��investigators, and to that end concluded agreements with NSU and NSTU.

According to Valery bukhtiyarova, at two universities in 2018 are master’s programs, which train specialists for research in the laboratories of the skiff. One of the first graduates of this program are already employed in the project office of the center for collective use. .

the Center of the complex – a circular building around the particle accelerator. The structure height – 16 meters, an outside diameter 238, the internal – 118 meters.

Previous articleChina plans to launch an unmanned probe on Mars on July 23
Next articleLiverpool home win Chelsea
Jennifer Alvarez is an investigative journalist and is a correspondent for European Union. She is based in Zurich in Switzerland and her field of work include covering human rights violations which take place in the various countries in and outside Europe. She also reports about the political situation in European Union. She has worked with some reputed companies in Europe and is currently contributing to USA News as a freelance journalist. As someone who has a Masters’ degree in Human Rights she also delivers lectures on Intercultural Management to students of Human Rights. She is also an authority on the Arab world politics and their diversity.