https://news.rambler.ru/img/2020/08/11/114526.662078.8403.jpg

The object is planned to be commissioned in 2021

The construction of roadside station “Printers” on the second route of the Moscow Central diameters (WDC-2) “Nahabino — Podolsk” is expected to be completed next year. “Printers” build between the stations “Kuban” (Lublin) and “textile workers” Kursk direction of Moscow railway. About it reports a press-service of the Moscow railway.

Stop “Printers” will be integrated with the stations “Printers” lyublinsko-Dmitrovskaya and a Large ring line of the Moscow metro. At the stop build two platform with canopy for the entire length and three-level pavilion. Exit to the city street Road will be via an overhead concourse and the street of Lublin — through the tunnel. The halls will be equipped with elevators and escalators will be located hall box office and turnstiles.

Contractors have completed the excavation of the underground tunnel and installed the concrete supports for the concourse and platforms. Currently there are works on construction of walls and stairs of the lobby. Experts are assured that all work will be completed on schedule in 2021. For Muscovites will improve the accessibility of the districts of Pechatniki, Tekstilshchiki and Lublin.