https://cdnimg.rg.ru/img/content/189/93/66/4444_d_850.jpg

When in the entrance hung a notice about the planned inspection of Gorgaz, Irina was surprised: “I cherish, but here extraneous, it is unclear how many houses before we walked”. Started to call the Federal hot line of Rospotrebnadzora. Thence in Gorgaz, where you had a phone the production office serving the house but not get out. In the end, together with the old neighbours Irina appeared in the list of “napustili”.

the next morning she again began to dial the number of the CPS: I wanted to know what to do. The operator was advised to go to posilaji. While Irina was waiting for an answer on the other end of the line, someone knocked on the door.

– Open – is the master in overalls, but without a mask and gloves, – says the citizen. – She saw me in the mask, took out his and asks: “are You in isolation? Why not warned? I would mark did.” Say, called many times – a tube nobody took. “Of course, all the rounds” – ingenuously replied the controller.

the Wizard was gone and the questions remain, because next week in the house of Irina planned inspection of ventilation another firm. Matters not she has one: the Urban villagers asked the Governor to Instagram: “can’t you postpone all mass testing before the end of quarantine?”. Fears are logical: in Gornouralskiy infected COVID-19 yet, but in Nizhny Tagil, where employees of the gas company, the number of cases is growing every day.

“the Situation with coronavirus demanded the suspension of many works. For example, put a temporary moratorium on verification. However, this does not concern procedures aimed at ensuring the life and security of residence. Checks should not be delayed, because the reliability of the gas equipment – the issue is very serious. Not to check, and if explosion? At the Federal level approved very clear rules of operation of gas equipment in homes and frequency of inspections. Thus workers of the gas service must comply with all requirements imposed in a period of high alert,” – said Eugene Kuyvashev.

As explained “RG” in the Ministry of energy and housing of the region, routine maintenance (THAT) of gas equipment and ventilation resumed may 12. Prior to that, teams traveled only for emergency calls. In a pandemic people sit at home, frequency of use of gas appliances has increased, and hence more risk.

– In accordance with RF government resolution No. 410 dated 14.05.2013 (as amended from 19.03.2020) “On measures to ensure the safe use and maintenance of intra-house and intra gas equipment” (together with “Rules of use of gas of providing utility services”) the frequency of the at least once a year. Graphics be subject to the staff number of the employees, admitted to work. One team provides services in the same building – said the Minister of energy and housing and communal services of the region Nikolay Smirnov. – The reviewer must comply with all imposed for the period of high alert requirements: this applies to masks, gloves, social distance and the so-called input filter for staff before leaving on address. The owner has the right to require the use of PPE from the masters, including to restrict access to the premises if they do not meet the requirements.

Rospotrebnadzor “RG” confirmed: tenants can report violations of the recommendations epimetopinae to the territorial offices, their phone numbers can be found on the website www.66.rospotrebnadzor.ru.

– If the traversals employees must comply with the social distance and to have PPE, – said the Deputy head of the regional Department Angelica Ponomarev.

– Our specialists are provided with masks, gloves, antiseptics, they give them daily. The staff are tested with a measurement of the temperature before the beginning of the shift and mid – assured Anna khorkova, chief specialist of the press service of “Ekaterinburggaz”. A subscriber who is afraid of outside contact, may postpone the date of the inspection – to the lifting of restrictive measures. Once you have seen the announcement in the entrance of the or schedule on the website (under “news” – information for the current day, see “maintenance Schedule of the gas equipment” – the data for a week), call their production office and explain the situation. Any statements not necessary to write phone numbers – on the main page. In addition, it is possible to transmit information via the Internet reception, I answer the same day.

as for the specific case of Irina, the most likely cause of the unpleasant situation is the lack of information and the notorious human factor, because the master came at nine in the morning, that is the apartment of Irina, she had the first shift. Disregard for the safety of self and others we are seeing, unfortunately, in public transport, and shops. It is an occasion to remind everyone of the personal responsibility of each of us for the health of all. Moreover, the CPS, as explained “RG”, is not authorized to transfer to the supplier and the organization addresses where the patients live a mild form COVID-19 and the contact.

Many residents fear that they will shut off the gas if they do not admit of the controller. In the gas service say this is a misconception, albeit common. Actually “valve overlap” only when leak detected on the network. Prior to checking in each house is carried out pressure testing of the pipeline using a special device. If it shows a pressure drop, then the system is leaking. This can be mikrotechna Thu��would be to remove it, you need to check the equipment in each apartment.

the other day we were in the RAID, along with gas on the streets of Iskra-ists and Norilsk to Yekaterinburg. In the private sector for a change of one master bypasses 7-8 houses. To test them even more difficult than the apartment: in addition to the plate, there is also the heater.

Locksmith Margarita Spiridonova quickly obmanivaet pipe at the entrance to the boiler room. Way old, but reliable.

with the Analyzer more convenient to use when the accumulation of gas in the room, but on the street he’s just about to show the place of micrococci. Soap is also good at detecting leaks thread: inflated bubble, – said Margarita.

According to her, two weeks after the resumption of inspections had to deal with different people’s reactions. Especially worried elderly tenants, they always pay attention to masks and gloves to the masters, asking the identity.

– just today, one woman phoned and said: unwell, don’t come. No problem. The gas service has phone numbers of all owners on the site. Usually call in advance, clarify whether the owners of the house at the appointed time. If there is no or asking to postpone the visit, meet, even more so now – adds master Vladimir Ryzhkov.

Not less questions readers ask about the repair: the decree of the Governor of this activity in the approved list, but what if the contractor is not repairing the roof or facade, and risers? As has explained the employee a press-services of the regional Fund of capital repair Eugene Hirsch, residents of the house can decide to let the workers in the apartment now or ask the contractor to postpone work to a later period, when lifting the isolation. Contracts with performers entered into before the end of the year. And the tenants don’t even have to sign the acts of refusing, as before.

Charts THE gas equipment in the Sverdlovsk region and phone numbers production offices at: www.ekgas.ru, www.gazeks.com, www.газсети.рф

In Kurgan scheduled inspection of the gas equipment at the time of the pandemic did not stop, he learned “RG” in a press-service “Gazprom gazoraspredelenie mound”. Maintenance is conducted only with the consent of the inhabitants of compliance with sanitary requirements. Subscribers offer remote interaction: they can make the call on the website www.kurgangazcom.ru. Those who are in isolation and doesn’t want to let anyone into the apartment, I advise you to make an appointment by telephone 04 (104 mobile) after the end of the quarantine.

However, recently under the guise of gas in the apartment started to penetrate the fraud. Tenants should know that the real experts are dressed in branded clothing gray-blue color with the company logo and have official identification, which must show on demand the owner�� housing. In addition, they do not impose on subscribers, not forced to install the meters, change the hoses and taps. And, most importantly, do not charge for the work in cash. Usually on her ward employees warning TEXT.

As reported by “RG” in Goszeminspektsii the Chelyabinsk region, the gas company check the equipment as planned. The pandemic is in the services, adjustments were made – the staff must have personal protective equipment.

– If this requirement is not fulfilled, it is necessary to notify the user of the service organization, – said the representative of the office of Yulia Lebedeva. – In all other cases, the security considerations quarantine restrictions and citizens are obliged to provide employees with access to the apartment.

Previous articleWatch Dr. Kashin
Next articleThe last knight
Jennifer Alvarez is an investigative journalist and is a correspondent for European Union. She is based in Zurich in Switzerland and her field of work include covering human rights violations which take place in the various countries in and outside Europe. She also reports about the political situation in European Union. She has worked with some reputed companies in Europe and is currently contributing to USA News as a freelance journalist. As someone who has a Masters’ degree in Human Rights she also delivers lectures on Intercultural Management to students of Human Rights. She is also an authority on the Arab world politics and their diversity.