https://news.rambler.ru/img/2020/06/25/180126.884199.6057.jpeg

In the capital along Dmitrovskoe shosse vigor is the construction of three new stations lyublinsko-Dmitrovskaya line of metro: “Ulitsa 800-letiya Moskvy”, “Lianozovo” and “PTI”. On this edition of “News of Moscow” have informed in a press-service of the complex urban policy and construction of Moscow.

“Mayor Sergei Sobyanin has opened a new sports Centre pentathlon in the North. The extension of the lyublinsko-Dmitrovskaya line is to improve transport accessibility of the Northern sector of the city. Now the construction is in located along the Dmitrovskoe highway to the future metro stations, as well as linking their hauls with pritoplennye structures”, – said the Deputy mayor, the head of construction Andrew Bochkarev.

From Lianozovo tunnels will extend beyond the MKAD in the village of North. Recently it was decided that this site will be underground and its construction should be completed by the end of 2022.

At the station “Ulitsa 800-letiya Moskvy” the device “wall in the ground” and vodopostachannya drilling wells. There is a strengthening of the walls of the pit station. For Lianozovo are solid, mastered the construction site of the future station “Phystech”.

In parallel with the construction of the stations is carried out tunnelling.