https://news.rambler.ru/img/2020/06/22/153457.034675.4299.jpg

In Moscow will be a multi-storey building, built of wood. Its construction plan to begin in the summer of 2021. About it reports “Interfax” with reference to the Vice-President and head of the division “Building” of the company Segezha Group Dmitry Rudenko.

The building will be built on the technology of CLT (cross-laminated timber) — wooden panels are made from glued together layers of solid timber. Often they are made of softwood. The work will be conducted jointly with the developer Etalon Group.

“no Details yet, because we still are working on the project (for the construction of wooden apartment buildings in Moscow — approx. “Of the tape.ru”), interoperability with Segezha Group. Now as long as the design of one of the houses. … This year we will finish the design, get the economy and then deal with the place where it will be this first house,” — said the representative of the Builder.

Earlier in Segezha Group reported that they intend jointly with Etalon Group to build two high-rise buildings in Moscow. The building was supposed to appear on the site, “ZIL-Yug” and be done just on the technology of CLT panels.