bad luck for the early birds: A road vehicle is currently blocking, of all things, the Gotthard-Tunnel. The tube is locked in both directions.

Until 7.45 at the Gotthard no way Through, writes of the Touring Club Switzerland (TCS) on Twitter.

at seven o’clock in the morning, have formed, therefore, first jams. At the North portal of the sheet metal column is two, at the South portal a Kilometer long. (hah)