https://news.rambler.ru/img/2020/07/11/103905.742950.5175.jpeg

This was told by Vice-mayor Pyotr Biryukov on Saturday, July 11.

According to him, the bridge, which is one of the symbols of the city, not repaired major with the built in 1938, the Agency reports city news “Moscow”. During this time, it started cracking in places destroyed granite slabs and joints, deteriorated support.

Repairs will help extend the life of the bridge for several decades. Complete the work planned in the fourth quarter of 2021. It is planned to restore not only structures, but also the reconstruction of the historic stained glass Windows.

Biryukov stressed that the repair will be carried out without full closure of the bridge: the movement will stop only on one half, the other can pass in both directions. Previously, such technology was used on the Big Moskvoretsky bridge.

6 Jul Biryukov said that the capital will resume work on capital repairs of apartment buildings. Special attention will be given to works related to preparation for winter, they will complete before the heating season, writes “the Newspaper.ru”.