https://news.rambler.ru/img/2020/08/14/164546.554430.2171.jpg

In the area of Sheremetyevo on the street adjusted the Aircraft traffic pattern. About it reported in a press-service of the Ministry of transport and road infrastructure of the Moscow region.

"August 14, in connection with the reconstruction of the road in the area of terminals B and C of Sheremetyevo airport, the adjusted scheme of movement of motor transport along the street Aviation", – said the Agency.

At the time of the changes, the fare will only be open for two lanes. On other roads it is planned to replace the road surface and to upgrade the utilities.

Work on the reconstruction of the Aviation streets will be completed by the end of 2020.

Earlier it became known that on August 16 will be closed to traffic in the area, Smolensk street. Restrictions to impose for the period of filming.

Previous article“Wafer” marking will appear on the seven intersections
Next articlePutin revealed their income
Jennifer Alvarez is an investigative journalist and is a correspondent for European Union. She is based in Zurich in Switzerland and her field of work include covering human rights violations which take place in the various countries in and outside Europe. She also reports about the political situation in European Union. She has worked with some reputed companies in Europe and is currently contributing to USA News as a freelance journalist. As someone who has a Masters’ degree in Human Rights she also delivers lectures on Intercultural Management to students of Human Rights. She is also an authority on the Arab world politics and their diversity.